1、Piping erection work include: prefabrication, placing, aligning, welding and bolting.

2、Field erection work will begin in October this year and complete on June first next year.

3、This paper briefly introduces the main supervising points of buildings weak current erection work.

4、The Ling'ao nuclear power generator should carry out the AC and DC withstand voltage tests to check the insulation performances of the unit after finishing the erection work on site.

5、Based on the erection period arranged between SELLER and BUYER, the SELLER shall delegate his personnel to supervise erection works in accordance with terms of this Contract.

6、Standard for quality inspection and assessment of building construction erection works (general machinery equipment)

7、Standard for quality inspection and assessment of building construction erection works (container)

8、All site erection works will be performed by the Buyer under the technical instruction of the Seller.

9、The tentative schedule of temporary traffic arrangement for bridge ML15 segment erection works is now available as shown below*.