1、This can save a lot of personnel cost.

2、Build the model that makes sense for your system, team, and personnel cost structure.

3、The research into post match system can achieve the goal of exploring human resources, stimulating the staff initiative and creativity with less personnel cost and input.

4、The solar energy and the heat pump water heater equipment, does not need the value to defend, movement absolute safety, moreover the completely automatic control, may save the personnel cost.

5、The study revealed that personnel cost are the biggest part of the total cost in both Jimo and Zhanyi, which account for 31.54% of total cost in Jimo and 27.01% of total cost in Zhanyi.