1、Putt him on line two.

2、The actual update happens on line 3.

3、Implementation of products detecting and rejecting on-line on type 49S crystal production line

4、An on line calculation method of transmission line parameters using synchronized phasor measurement is proposed.

5、There are no new buildings coming on line in Central.

6、Note that the transmission line is terminated on both ends of the line but not at drop points in the middle of the line.

7、Line 11 USES the E4X curly brackets syntax to insert the share symbol extracted on line 4 into the envelope.